Skip to main content
File #: 16-492    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 5/9/2016 In control: City Commission
On agenda: 6/7/2016 Final action: 12/31/2023
Title: CERTIFICATION OF THE FINAL PLAT FOR THE METROPOLITAN (QUASI-JUDICIAL HEARING)
Sponsors: Planning & Zoning Department
Attachments: 1. Metropolitan - Final Plat - 4-18-16 Staff Report - 12MB, 2. Consent Agenda Acknowledgement Form - Metropolitan Plat, 3. Metropolitan Plat - Board Order - 06-07-16

TO:                  Mayor and Commissioners

FROM:            Timothy Stillings, Planning Zoning & Building Director

THROUGH:   Donald B. Cooper, City Manager

DATE:             June 7, 2016

 

Title

CERTIFICATION OF THE FINAL PLAT FOR THE METROPOLITAN (QUASI-JUDICIAL HEARING)

 

Body

Recommended Action:

Recommendation

Approve certification of the final plat for The Metropolitan, by adopting the findings of fact and law contained in the staff report, and finding that the request is consistent with the Comprehensive Plan and meets criteria set forth in Land Development Regulations Section 2.4.5(J)(Major Subdivisions), Section 3.2.3 (Standards for Plat Actions) and Section 3.1.1 (Required Findings).

 

Body

Background:

The Metropolitan mixed-use development proposes to remove the existing surface parking areas and construct a 57-foot high, five-story, mixed-use development containing 48 condominium units on the upper levels and 3,741 sq. ft. of retail, 1,318 sq. ft. of office and covered parking on the ground level, all within one phase. The site is located at the northeast corner of SE 3rd Avenue and SE 1st Street. The subject property consists of Town Of Delray Lots 20 through 33 of Block 93 and measures 0.929 acres.  The parcel has a Future Land Use Map (FLUM) designation of Central Core (CC) and is zoned Central Business District (CBD). The lots currently contain surface parking lots previously owned by SunTrust Bank.

 

On June 10, 2015, the Site Plan Review and Appearance Board (SPRAB) approved the Class V Site Plan proposal for The Metropolitan.

On March 21, 2016, the Planning and Zoning Board conditionally approved the preliminary plat.

On April 18, 2016, the Planning and Zoning Board recommended certification of the final plat.

 

Plat Analysis:

The 0.929 Acre Metropolitan Plat will consist of Lots 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 and 33 of re-subdivision of Block 93, according to the public records of Palm Beach County as reflected in the Town of Delray Subdivision Plat (PB 10 PG 53), lying In Section 16, Township 46 South, Range 43 East of the City of Delray Beach. The development proposal includes the aggregation of these 14 existing combined lots.

 

The Metropolitan Plat includes “Parcel A” and “Tract RW”. “Tract RW” consists of a 10’ x 10’ corner clip at the intersection of the alley and SE 1st Street, a 20’ x 20’ corner clip at the intersection of SE 3rd Avenue and SE 1st Street, a 5’ right-of-way dedication along SE 3rd Avenue, a 2’ right-of-way dedication along the alley and a 2.5’ right-of-way dedication along SE 1st Street. “Parcel A” consists of the balance of the site, less the corner clips, alley right-of-way dedication and road right-of-way dedications as indicated in “Tract RW”.

 

All technical comments have been satisfied.

 

City Attorney Review:

Approved as to form and legal sufficiency.

 

Timing of Request:

Plat approval and recordation is required prior to issuance of building permits.