Title: ITEM(S) A1 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 1701 N SWINTON AVE. ITEM(S) A2 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 720 NW 3RD AVE. ITEM(S) A3 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 104 SEABREEZE AVE.
Sponsors: Public Works Department
Attachments: 1. Agenda Cover Report, 2. A1a - Right of Way Deed - 1701 N Swinton Ave - Maper Investments LLC, 3. A1b - Legal Review Right of Way Deed - 1701 N Swinton Ave - Maper Investments LLC, 4. A2a - Right of Way Deed - 720 NW 3rd Ave - 720 NW 3 LLC - Bella Homes II LLC - Bella Homes LLC, 5. A2b - Legal Review Right of Way Deed - 720 NW 3rd Ave - 720 NW 3, LLC, 6. A3a - Right of Way Deed - 104 Seabreeze Ave - Krysti and Donnie Hinton, 7. A3b - Legal Review ROW Deed -104 Seabreeze Ave - Krysti and Donnie Hinton
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                          Mayor and Commissioners

FROM:                     Missie Barletto, Public Works Director

THROUGH:                     Terrence R. Moore, ICMA-CM

DATE:                     November 4, 2024

 

Title

ITEM(S) A1 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 1701 N SWINTON AVE.

 

ITEM(S) A2 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 720 NW 3RD AVE.

 

ITEM(S) A3 - ACCEPTANCE OF A RIGHT-OF-WAY DEDICATION BY 104 SEABREEZE AVE.

 

Body

Recommended Action:

Recommendation

 Consideration of the following items:

 

Item A1 - Motion to approve and accept a Right-of-Way Dedication by the owners of  1701 N Swinton Ave.

 

Item A2 - Motion to approve and accept a Right-of-Way Dedication by the owners of 720 NW 3rd Ave.

 

Item A3 - Motion to approve and accept a Right-of-Way Dedication by the owners of 104 Seabreeze Ave.

 

Body

Background:

 

Item A1

 

Consider acceptance of a Right-of-Way Dedication located at 1701 N. Swinton Ave.

 

The owner(s) submitted a building permit application for the subject property. During the application process it was determined that in accordance with LDR 5.3.1 (A) the roadway has an ultimate Right-of-Way of 50 ft. That corresponds to a half-width of 25 ft.  The current Right-of-Way half-width is 40 ft.  As a result, a 5 ft. Right-of-Way dedication was requested to satisfy the requirement. It was also determined that in accordance with LDR Section 6.1.2(C)(2)(e) for the intersecting roadways, a 25’ radius Right-of-Way is required and was also requested.

 

There is no City cost now or in the future for these items.

 

 

Item A2

 

Consider acceptance of a Right-of-Way Dedication located at 720 NW 3rd Ave.

 

The owner(s) submitted a building permit application for the subject property. During the application process it was determined that in accordance with LDR 5.3.1 (A) the alley in the rear of the property has an ultimate Right-of-Way of 20 ft. That corresponds to a half-width of 10 ft.  The current Right-of-Way half-width is 8 ft.  As a result, a 2 ft. Right-of-Way dedication was requested to satisfy the requirement.

 

There is no City cost now or in the future for these items.

 

 

Item A3

 

Consider acceptance of a Right-of-Way Dedication located at 104 Seabreeze Ave

 

The owner(s) submitted a building permit application for the subject property. During the application process it was determined that in accordance with LDR 5.3.1 (A) the roadway has an ultimate Right-of-Way of 40 ft. That corresponds to a half-width of 25 ft.  The current Right-of-Way half-width is 34 ft.  As a result, a 3 ft. Right-of-Way dedication was requested to satisfy the requirement. It was also determined that in accordance with LDR Section 6.1.2(C)(2)(e) for the intersecting roadways, a 25’ radius Right-of-Way is required and was also requested.

 

There is no City cost now or in the future for these items.

 

 

City Attorney Review:

Approved as to form and legal sufficiency.

 

Funding Source/Financial Impact:

N/A

 

Timing of Request:

The timing of these requests is of high importance to allow projects to continue construction.