File #: 16-621    Version: 1 Name:
Type: Request Status: Agenda Ready
File created: 6/15/2016 In control: City Commission
On agenda: 7/5/2016 Final action: 12/31/2023
Title: PRESENTATION OF THE ARCHITECTURAL DESIGN FOR BEACH AREA MASTER PLAN
Sponsors: Environmental Services Department
Attachments: 1. Beach Master Plan Conceptual Plan Presentation

TO:                                          Mayor and Commissioners

FROM:                     John Morgan, Director Environmental Services

THROUGH:                     Donald B. Cooper, City Manager

DATE:                     July 5, 2016

 

Title

PRESENTATION OF THE ARCHITECTURAL DESIGN FOR BEACH AREA MASTER PLAN

 

Body

Recommended Action:

Recommendation

Motion to approve the design for the Beach Area Master Plan, as presented or with modifications as directed by the City Commission, providing authorization to the consultant to proceed with preparing final design documents and required permit applications.

 

Body

Background:

EDSA, Inc. was selected in May 2016 to design and manage the construction for the Beach Area Master Plan. The design is based upon the conceptual Beach Area Master Plan recommendations from the beach design charrette on November 4, 2009; which was presented to the City Commission on May 18, 2010. Since approval of the contract, EDSA has completed the required survey work and developed a preliminary design. Pre-application meetings have been held with the Florida Department of Transportation, the Florida Department of Environmental Protection, and the Florida Fish and Wildlife Conservation Commission. The DSMG reviewed the design on  June 9th and provided guidance to the consultant. A public outreach meeting was held on June 30th with stakeholders to obtain input on the preliminary design prior to presentation to the Commission for discussion and approval.

 

Finance Department Review:

Finance recommends approval.   The EDSA design work is expected to cost $ 464,350, with $ 2,535,650 remaining for the completion of the project.   

 

Funding Source:

Account Number - 334-4144-572-63.20 (General Construction Fund: Parks & Recreation - Improvements Other Landscaping / Beautification)

 

Timing of Request:

This project is on an accelerated schedule and Commission approval of the design at this time is necessary in order to stay on schedule, proceed to the permitting process, and begin construction later this summer.