Skip to main content
File #: 22-585    Version: 1 Name:
Type: Advisory Board Agenda Item Status: Agenda Ready
File created: 4/27/2022 In control: Board of Adjustment
On agenda: 5/5/2022 Final action: 12/31/2023
Title: 219 Palm Trail (2022-115): Consideration of variance requests from Land Development Regulation (LDR) Section 7.9.7(C) and LDR Section 7.9.11(A), to allow a finger pier to extend eight feet one inch beyond the 25 foot maximum distance permitted and to allow a boat lift to extend 13 feet one inch beyond the 20 foot maximum distance permitted into the waterway. Address: 219 Palm Trail PCN: 12-43-46-16-09-000-0090 Agent: The Chappell Group, INC.: kathryn@thechappellgroup.com Planner: Rachel Falcone: FalconeR@mydelraybeach.com
Attachments: 1. 219 Palm Trail - Memorandum (May 5, 2022), 2. 219 Palm Trail - BOA Staff Report (April 7, 2022), 3. 219 Palm Trail - Baseline Survey, 4. 219 Palm Trail - Site Plan / Hydrographic Survey (May 5, 2022), 5. 219 Palm Trail - Site Plan / Hydrographic Survey (April 7, 2022), 6. 219 Palm Trail - Previous Justification Statements (April 7, 2022)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

219 Palm Trail (2022-115): Consideration of variance requests from Land Development Regulation (LDR) Section 7.9.7(C) and LDR Section  7.9.11(A), to allow a finger pier to extend eight feet one inch beyond the 25 foot maximum distance permitted and to allow a boat lift to extend 13 feet one inch beyond the 20 foot maximum distance permitted into the waterway.

Address: 219 Palm Trail

PCN: 12-43-46-16-09-000-0090

Agent: The Chappell Group, INC.: kathryn@thechappellgroup.com

Planner: Rachel Falcone: FalconeR@mydelraybeach.com