TO: Mayor and Commissioners
FROM: Missie Barletto, Public Works Director
THROUGH: Terrence R. Moore, ICMA-CM
DATE: December 8, 2025
Title
APPROVAL OF AN INTERLOCAL AGREEMENT (ILA) BETWEEN THE CITY OF BOYNTON BEACH AND THE CITY OF DELRAY BEACH FOR FUNDING THE CONSTRUCTION PHASE OF SE 36TH AVENUE/GULFSTREAM BOULEVARD IMPROVEMENTS IN AN AMOUNT NOT TO EXCEED $1,500,000.00
Body
Recommended Action:
Recommendation
Motion to approve an ILA between the City of Boynton Beach and City of Delray Beach and for funding the Construction Phase of SE 36th Avenue/Gulfstream Boulevard Improvements in an amount not to exceed $1,500,000.00.
Body
Background:
SE 36th Avenue/Gulfstream Boulevard is jointly owned by both the City (eastbound lane/southern portion) and Boynton Beach (westbound lane/northern portion). Both the City and Boynton Beach previously entered into an ILA, dated May 19, 2020, as amended by the First Amendment dated February 25, 2021, to provide for the shared expenses of the engineering design for improvements from Seacrest Boulevard eastward to the Florida East Coast Railway (FEC) right-of-way (ROW). The scope of work consists of roadway widening for an existing two-lane road with milling and resurfacing; a new 10-foot-wide concrete shared-use path on Boynton Beach’s side, and an 8-foot-wide concrete shared-use path on Delray Beach’s side; landscape removals and new plantings; irrigation; reconstruction of medians; 24-inch drainage pipe inclusive of drainage structures and 6-foot-wide exfiltration trenches; water service replacement; swale re-grading; lighting; and incidental construction of curbs, sidewalks, driveways, sod, pavement markings, signage, and utility reconstruction (the “Streetscape Portion”) and construction of a new watermain (“Watermain Portion Phase I”).
The planning/design phase of the project has been completed. The proposed ILA between the City and Boynton Beach is required to allocate each party’s pro rata share of expenses f...
Click here for full text