TO: Mayor and Commissioners
FROM: Lynn Gelin, City Attorney
DATE: October 15, 2024
Title
RESOLUTION NO. 212-24: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DELRAY BEACH, FLORIDA, AUTHORIZING JASON KAUFMAN, P.E., ENGINEERING DIVISION MANAGER OF THE DEPARTMENT OF PUBLIC WORKS TO BIND THE CITY OF DELRAY BEACH IN EMINENT DOMAIN PROCEEDINGS BEFORE THE COURT IN THE 15TH JUDICIAL CIRCUIT; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES.
Body
Recommended Action:
Recommendation
Review and Approve Resolution 212-24
Body
Background:
The City of Delray Beach (the “City”) owns and operates the Thomas Street Pump Station located on the Thomas Street right-of-way west of Seabreeze Avenue in Delray Beach, Florida. This pump station currently provides stormwater pumping for the 50-acre drainage basin including Thomas Street, Vista Del Mar Drive, and part of Andrews Avenue and Lowry Street. The City of Delray Beach Stormwater Master Plan, completed by ADA Engineering in February 2019, proposed capacity increases and other major infrastructure improvements to meet South Florida Water Management District and Level of Service criteria for both current and 30-year Sea Level Rise tidal conditions.
A new 85,000 GPM stormwater pump station will be constructed with an upgraded drainage network, backup generator, diesel fuel tank, buried underground powerlines, and an onsite water treatment facility. The City intends to construct and install the new expanded stormwater pump station in the same location as the existing pump station (the “Project”). In order to complete the Project, the City requires the acquisition of a permanent easement and a temporary easement on the property located at 142 Seabreeze Avenue, and a permanent easement on the property located at 202 Seabreeze Avenue (collectively referred to as the “Easements” and the “Property”).
On May 7, 2024, the City Commission approved Resolutions 91-24 and 93-24, authorizing the City to exercise its emine...