File #: 18-394    Version: 1 Name:
Type: Request Status: Passed
File created: 6/14/2018 In control: City Commission
On agenda: 7/17/2018 Final action: 7/17/2018
Title: FINAL SUBDIVISION PLAT FOR 1125 WALLACE DRIVE.
Sponsors: Planning & Zoning Department
Attachments: 1. Agenda Cover Report, 2. 1125 Wallace Drive Plat, 3. 1125 Wallace Drive Plat PZB Staff Report 022717, 4. 1125 Wallace Drive Location
TO: Mayor and Commissioners
FROM: Timothy Stillings, Planning, Zoning and Building
THROUGH: Mark R. Lauzier, City Manager
DATE: July 17, 2018

Title
FINAL SUBDIVISION PLAT FOR 1125 WALLACE DRIVE.

Body
Recommended Action:
Recommendation
Motion to approve and certify the Final Plat for 1125 Wallace Drive, by adopting the findings of fact and law contained in the staff report, and finding that the request is consistent with the Comprehensive Plan and meets the criteria set forth in Land Development Regulations (LDR) Section 2.4.5(J), Major Subdivisions, LDR Section 3.2.3, Standards for Site Plan and/or Plat Actions, and LDR Section 3.1.1, Required Findings for Land Use and Land Development Applications.

Body
Background:
The site is located within the Wallace Drive Overlay District associated with the Wallace Drive Industrial Area Redevelopment Plan. The approved redevelopment of the site consists of the construction of a two-story climate controlled self-storage building, a one-story self-storage building, a 6 space outdoor vehicle storage area, and associated site improvements consisting of parking, landscaping, and lighting.

The site consists of 10 individual parcels totaling 2.421 acres zoned Light Industrial (LI) and is vacant with the exception of one vacant single family residence constructed in 1947. The platting of the subject properties requires a 10 foot wide right of way dedication along Wallace Drive and along SW 10th Street, which results in a single 2.27 acre parcel (Parcel A). The complete review of the plat is provided in the attached Planning and Zoning Board Staff Report.

City staff has reviewed the plat and determined that all technical comments have been satisfied. Pursuant to LDR Section 2.4.5(J)(1), Major Subdivision (platting), Rule: the major subdivision process shall involve both the Planning and Zoning Board and the City Commission. The Planning and Zoning Board approved the preliminary plat and recommended certification of the ...

Click here for full text