File #: 18-0451 CRA    Version: 1 Name:
Type: CRA Contract Status: Agenda Ready
File created: 9/23/2019 In control: Community Redevelopment Agency
On agenda: 10/1/2019 Final action:
Title: REJECTION OF BID FOR 2019-08 - CONSTRUCT NEW FOUNDATION 20 N SWINTON AVENUE
Attachments: 1. Agenda Cover Report, 2. Exhibit A - Location Maps 20 N Swinton & 215 NE 7th Ave, 3. Exhibit B - Photo of Historic Home
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
TO: CRA Board of Commissioners
FROM: Tara Toto, Project Manager
THROUGH: Renée A. Jadusingh Esq., Executive Director
DATE: October 1, 2019

Title
REJECTION OF BID FOR 2019-08 - CONSTRUCT NEW FOUNDATION 20 N SWINTON AVENUE

Body
Recommended Action:
Recommendation
Reject the bid submitted by Marvi Builders LLC in the amount of $210,465.78 to construct a new foundation and associated required site work at 20 North Swinton Avenue and reissue the bid in order to obtain multiple, fair and reasonable bid submittals based on the costs associated with the proposed scope of work.

Body
Background:

The 1939 single-family residence currently located at 215 NE 7th Avenue was designed by Samuel Ogren, a prominent and well-known architect in Delray Beach. The 2,800 square foot, two-story historically contributing structure has a vernacular architectural style which will be consistent and historically contributing structure to the new location at 20 North Swinton Avenue. Once relocated, this structure will be registered with the local registry of Historic Places and be used as additional office space for the Delray Beach CRA.

At the June 11, 2019 CRA Board Meeting, the Board awarded Invitation to Bid to relocate the historic house from 215 NE 7th Avenue to 20 North Swinton Avenue. An RFB (2019-08) to construct the foundation for the relocated house was prepared and issued on August 26, 2019 with a submittal deadline of September 27, 2019.

The Scope of Work includes the following:
· Site preparation
· Maintain safety fencing and safety measures throughout the project
· Construction of the foundation per permit drawings
· Relocation and connection of utilities including, but not limited to water, sewer, and fire
· Coordinate construction of the new foundation with the moving contractor
· Securing the relocated house to the new foundation

Request for Bids Analysis:
On September 27, 2019, the CRA received one (1) response to the RFB:

BIDDER CONTRACT PRICE
MARV...