TO: Mayor and Commissioners
FROM: Missie Barletto, Assistant Public Works Director
THROUGH: Suzanne Fisher, Assistant City Manager
THROUGH: Neal de Jesus, Interim City Manager
DATE: December 10, 2019
Title
APPROVE UTILIZING SOURCEWELL EZIQC CONTRACT NO. FL-SEA-GC02-041019-SCD WITH SHIFF CONSTRUCTION AND DEVELOPMENT, INC. FOR RENOVATIONS TO THE PARKS AND RECREATION MAINTENANCE FACILITY, BUILDING E, AT THE SWINTON OPERATIONS COMPLEX IN AN AMOUNT NOT-TO-EXCEED $249,808.60 IN COMPLIANCE WITH RESOLUTION 124-19 ADOPTED BY COMMISSION ON AUGUST 20, 2019.
Body
Recommended Action:
Recommendation
Motion to approve expenditure in an amount not to exceed $249,808.60 in compliance with Resolution No. 124-19 adopted by the City of Delray Beach (City) City Commission on August 20, 2019 to utilize Sourcewell (formerly known as National Joint Powers Alliance) ezIQC Contract No. FL-SEA-GC02-041019-SCD with Shiff Construction and Development, Inc. for required renovations to the Parks and Recreation Maintenance Facility, Building E, located at the Swinton Operations Complex.
Body
Background:
The Parks and Recreation Maintenance Facility, Building E, located at the Swinton Operations Complex has experienced issues with roof leaks that have caused moisture and mold issues within the office spaces in the facility. Air conditioning duct work has experienced accumulated moisture creating an unhealthy working condition for employees housed in this facility. In the late 1970s, the size of this building was doubled by adding approximately 7,500 square feet of equipment bays to store maintenance equipment that is utilized in City Parks and to maintain City rights of way. No renovations have been made to this building in the years since this initial work was completed.
This project will replace the air conditioning units and duct work in the office area of the building, R30 insulation will be added where there is none, ceilings and light fixtures will be replaced, as well as da...
Click here for full text